Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13700603

- Product Categories
- Friendly Links
Information Name: | Liaocheng to Zhangjiagang logistics green logistics company 15,166,511,389 |
Published: | 2015-07-04 |
Validity: | 600 |
Specifications: | |
Quantity: | 1.00 |
Price Description: | |
Detailed Product Description: | Liaocheng to Zhangjiagang logistics green logistics and transport companies the Urban Planning Bureau to provide information indicating that Jiqinggaosu expansion project along the old front line expansion. By Qingdao Jimo, Jiaozhou City, Weifang Gaomi north, north of downtown, north of Changle, Qingzhou north, north Zibo City Linzi, Zhoucun north, Zouping County, Binzhou City, Jinan City Zhangqiu North, Route length of approximately 309.2 km. Where to Qingdao City in the route length of approximately 32.9 kilometers. Since the territory Qingdao Jimo 朱家官 village, from east to west by Zhao Tun, blue village, into the Jiaozhou, back to the village by the large cross Dagu, Ma Zhen, East caicun, and finally west banks of Jiaozhou ink density community . Across the board according to the standard two-way eight-lane freeway expansion, monolithic roadbed width 42 meters, the design speed of 120 km / h. Reporters learned from the Provincial Department of Transportation, Jinan-Qingdao Expressway expansion project tender notice was published recently, the construction unit of Shandong Expressway Company Limited, the investment estimate for the total amount of 28.17 billion yuan. According to preliminary announcement, the project will Bridge 2 expansion, renovation and expansion of the bridge 15, bridge 24, 91 bridges, 542 culverts; Interchange 32 (New 7, rebuilt 25), separation Interchange 73 (New 51 by 9, extension 13); channel 380, the bridge 62; Service Area 6 (a new one, moving an expansion 4), parking area 2, both is added. Publicity program Jinan City Department of Transportation show that, in general to the whole line, Jiqing expansion project since the end of the route: green silver line expansion starting in the West Village Green and silver 朱家官 Jimo Nanquan interchange to interchange between the hub; end at the Green Bank wire tang hub. Wide economic expansion starting in the green line Silverstrand Tang hub; end at the G35 economic interchange zero-Guangzhou line, connecting with the Jinan Second Ring Road and viaduct ground. |
Admin>>>
You are the 9923 visitor
Copyright © GuangDong ICP No. 10089450, Liaocheng Wantong freight logistics company All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 9923 visitor
Copyright © GuangDong ICP No. 10089450, Liaocheng Wantong freight logistics company All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility